Let’s build a better future together
Visit the website of the energy lending crowdfunding platform Ener2Crowd and find out about the Trino solar park. Join Italy on its energy transition journey and be part of the change.
We’re building the Trino solar park in the municipality of Trino in the province of Vercelli, Piedmont. It will be one of the largest ground-mounted solar plants in northern Italy, and will be built on a production site of around 130 hectares adjacent to the former Galileo Ferraris electric power plant.
The plant will be built with the best technologies currently available on the market: photovoltaic panels which can absorb energy on both sides (bifacial modules) will be mounted on structures able to follow the movement of the sun during the day (mono-axial trackers), so as to maximize the amount of renewable energy produced.
The approximately 86 MW plant will be coupled with a 25 MW electrochemical storage system capable of ensuring a sufficient supply of electricity to meet demand and providing ancillary services to the grid.
Ground-mounted solar PV + batteries
Under construction
85.9 MW + 29.82 MW of electrochemical storage
Approximately 56,000 metric tons of CO2 per year
Approximately 29 million cubic meters of gas per year
Approximately 48,000 Italian families per year*
*Estimation based on average annual consumption of a typical family